The Brief.

The proposed scheme entailed the reinstatement of the waste transfer station following fire damage. The scope of works included

  • Enabling works
  • Decontamination, disinfecting and cleaning
  • Stanchion repairs
  • Construction of concrete retaining wall
  • Temporary works – scaffold and access equipment
  • Strip out of rainwater goods
  • Removal / installation of Sloped Steel Tops
  • Painting and decoration
  • Installation of general items
  • Replacement of cladding to unit
  • Mechanical and electrical installations